Case Study

Rocky Mountain Cold Storage

Project Overview

Insulated Roofing for a Temperature-Critical Cold Storage Facility

Rocky Mountain Cold Storage needed a roofing system that would hold up to constant temperature differentials between the conditioned interior and Colorado’s exterior swings, without compromising insulation value.

We installed a 40,000 SF spray foam roofing system, sized and detailed to protect the facility’s refrigeration performance and control energy costs.

40,000
SF Installed
5
Weeks Completed
0
Safety Incidents
20-yr
Warranty
Project Documentation

Before, During & After

Before

Existing roof with insulation gaps affecting facility temperature control.

During

Spray foam application across the refrigerated warehouse roof deck.

After

Completed 40,000 SF insulated roofing system.
Project Gallery

40,000 SF, Built for the Cold Chain

More Projects

Related Case Studies

Industrial Water

Northern Colorado Water Treatment Facility

30,000 SF corrosion-resistant coating system for a municipal water treatment facility.
View Case Study
Military

Buckley Space Force Base

75,000 SF secure-site roof replacement across active military installation buildings.
View Case Study
Mining

Climax Mine Maintenance Facility

22,000 SF high-altitude roof system for a molybdenum mine maintenance facility.
View Case Study